雨发玻璃温室大棚附属设施项目工程施工组织设计

 2023-01-17 09:05:55

论文总字数:29453字

摘 要

本文主要叙述关于雨发大棚附属设施的施工组织设计,写有关工程概况、施工部署和各分部分项施工方法以及工程保障措施。本设计详细写出各个分部分项工程如基础工程,钢筋工程,模板工程,混凝土工程,砌筑工程,屋面防水工程,装饰工程等的具体操作。同时编制施工进度计划安排表以及施工临时场地布置图。

关键词:施工部署;施工方案;文明施工

Construction organization design of auxiliary facilities in YuFa greenhouse

Abstract

This paper mainly describes the construction organization design of the auxiliary facilities of Yufa greenhouse, and describes the general situation of the project, the construction deployment, the construction methods of each division and item, and the engineering guarantee measures. This design details the specific operation of each sub project, such as foundation engineering, reinforcement engineering, formwork engineering, concrete engineering, masonry engineering, roof waterproof engineering, decoration engineering, etc. At the same time, the construction schedule and temporary construction site layout are prepared.

Key words: Construction deployment; Construction scheme; Civilized construction目 录

摘要...................................................................................Ⅰ

Abstract...............................................................................Ⅱ

第一章 项目简介........................................................................1

1.1 编制依据.......................................................................1

1.2 工程概况.......................................................................1

第二章 施工部署........................................................................3

2.1 组织机构及分工.................................................................3

2.2 施工准备.......................................................................3

2.2.1组织劳动人员进场...........................................................3

2.2.2技术准备...................................................................3

2.2.3资源准备...................................................................4

2.2.4施工现场准备...............................................................4

2.3施工进度计划...................................................................5

2.3.1主要项目施工进度计划.......................................................5

2.3.2确保施工管理措施...........................................................5

2.3.3预防意外情况的具体措施.....................................................6

2.4劳动力安排计划.................................................................6

2.4.1、劳动力组织准备和需要量计划................................................6

第三章 主要分部分项工程施工方案........................................................8

3.1 施工测量.......................................................................8

3.1.1找平.......................................................................8

3.1.2轴线控制 ..................................................................8

3.2 基础工程......................................................................8

3.3 钢筋工程......................................................................9

3.3.1钢筋的质量要求.............................................................9

3.3.2钢筋加工...................................................................9

3.3.3钢筋连接...................................................................9

3.3.4钢筋的绑扎和安装...........................................................10

3.3.5钢筋安装规定...............................................................13

3.4 模板工程......................................................................16

3.4.1准备工作..................................................................16

3.4.2 模板安装..................................................................16

3.4.3模板的拆除 ...............................................................17

3.5 混凝土工程...................................................................17

3.5.1混凝土浇筑与振捣的一般要求................................................17

3.5.2混凝土泵送的一般要求......................................................18

3.5.3混凝土施工缝的留置........................................................18

3.5.4混凝土坍落度的测试........................................................18

3.5.5楼板混凝土的压光操作......................................................18

3.5.6混凝土的养护..............................................................18

3.5.7混凝土试块的留置 .........................................................19

3.6 砌筑工程...................................................................19

3.6.1材料准备..................................................................19

3.6.2机具准备..................................................................19

3.6.3现场准备..................................................................19

3.6.4施工工艺及技术要求........................................................19

3.7 屋面防水工程.................................................................22

3.8 装饰工程.....................................................................23

第四章 工程保证措施..................................................................24

4.1 工期目标和保证措施...........................................................24

4.2 质量目标及保证措施...........................................................24

4.3 安全文明施工目标及保证措施...................................................25

4.4 环境保护措施.................................................................26

结束语...............................................................................27

致谢.................................................................................28

参考文献.............................................................................29

附录.................................................................................30

剩余内容已隐藏,请支付后下载全文,论文总字数:29453字

您需要先支付 80元 才能查看全部内容!立即支付

该课题毕业论文、开题报告、外文翻译、程序设计、图纸设计等资料可联系客服协助查找;