论文总字数:27368字
目 录
摘 要 2
Abstract: 3
1、提标改造背景 4
1.1我国水环境 4
1.2江苏省污水处理进程 4
1.3 国外污水处理厂概况 5
1.3.1新加坡污水处理厂现状 5
1.3.2美国污水处理厂现状 6
2、提标改造前污水处理厂分析 8
2.1 污水处理厂概况 8
2.1.1污水处理厂采用的处理工艺流程 8
2.1.2主要设备 8
2.2 CAST工艺(循环式活性污泥法) 10
2.2.1 基本内容 10
2.2.2 工艺机理 11
2.2.3工艺特点 11
2.2.4工艺主要设备 11
2.3提标改造前水质分析 12
2.3.2提标改造前出水水质分析 13
3、污水处理厂提标改造 14
3.1项目内容 14
3.2污水处理厂提标改造工艺 14
3.2.1 CAST生化池改进 15
3.2.2中间提升泵房 16
3.2.3后置反硝化滤池 16
3.2.4纤维转盘滤池 17
3.2.5化学除磷工艺 17
3.3改造后运行现状 18
3.4 改造后四季水质与污染物消减量 20
3.5 江苏某污水处理厂改造与陕西某污水处理厂提标改造比较 21
4、结论与建议 24
4.1 结论 24
4.2 建议 24
参考文献 26
江苏某地污水处理厂的提标改造分析
付君鹏
,China
Abstract:
With the development of economy and population growth, water pollution is increasingly serious, and the requirement of environmental protection, pollutant discharge standard level 1 B have been unable to meet the needs of society, the sewage treatment plant DiBiao reform is imminent. Since 2007 occurred algae outbreak in taihu lake, jiangsu province is located in the taihu lake watershed of the sewage treatment plant are conducted DiBiao renovation project.
This paper is mainly about the transformation of a sewage treatment plant in Jiangsu province. According to the sewage treatment plant before and after the water quality indicators, analysis of sewage treatment plant to carry out the feasibility of the project. Until the plant transformation of water quality for BOD5=15 mg/L, COD=56 mg/L, SS=16 mg/L, TN=18 mg/L, TP=0.8 mg/L; through reform, present situation of water quality for BOD5=1.3 mg/L, COD=31.5 mg/L, SS=7 mg/L, TN=7.8 mg/L, TP=0.3 mg/L wastewater treatment. In the provided before and after the reform, the reform before can reduce pollution load: BOD5=10117 kg/d, COD=13409 kg/d, SS=11597 kg/d, TN=1570 kg/d, TP=217 kg/d; mentioned standard transformation: BOD5=11542 kg/d, COD=15507 kg/d, SS=13008 kg/d, TN=2059 kg/d, TP=255 kg/d.Before and after the difference is: COD=2098 kg/d, BOD5=1425 kg/d, SS=1411 kg/d, TN=489 kg/d, TP=38 kg/d. By comparison, it can be concluded that the sewage treatment plant has a significant role in the improvement of pollutant emission reduction. Finally, the Shaanxi Province in a sewage treatment plant mentioned standard transformation of Shaanxi Province, sewage treatment plant transformation of water quality for BOD5=20 mg/L, COD=60 mg/L, SS=20 mg/L, TN=15 mg/L, TP=1 mg/L; after the reform, present situation of water quality for BOD5=33 mg/L, COD=60 mg/L, SS=31 mg/L, TN=40 mg/L, TP=3.5 mg/L. The transformation of the former pollutant reduction for BOD5=1148 kg/d, COD=2240 kg/d, SS=1332 kg/d, TN=276 kg/d, TP=38 kg/d; after the reform, present situation of water quality for BOD5=2325 kg/d, COD=4275 kg/d, SS=2655 kg/d, TN=437 kg/d, TP=56 kg/d. By comparison, we can get the success of this transformation, and this paper provides a good reference for the transformation of the A of the most sewage treatment plant.
Keywords sewage treatment plant; extraction and transformation; pollutant discharge; pollutant monitoring
1、提标改造背景
1.1我国水环境
据统计,我国水资源总量约为2.4万亿立方米,约占地球水资源总量的7%,居地球总量第六位。与此同时,我国人口相当于世界人口的五分之一,人均水资源仅占世界平均水平的四分之一,水资源在世界排名第88位,被列为世界人均水资源贫乏国家之一[1]。我国660多个城市中,缺水城市有400多个,其中严重缺水城市114个。即便在多水的长江流域也有缺水城市59个,缺水县城155个,其中不少缺水城市为水质型缺水城市。同时我国水污染较为严重,我国的七大水系均受到一定程度的污染,尤其是自从改革开放以来,我国工业发展迅速,经济高速发展,工业化的加快所带来的就是我国水污染日益严重,许多污水处理厂不按照排放标准排放污水,甚至于有部分污水处理厂干脆不处理就直接将污水排入水体,造成我国水体污染愈发严重。
1.2江苏省污水处理进程
据统计,截至2010年底,按一级B标准设计的污水处理厂有1500多座,按二级标准设计的污水处理厂有600多座[2],排放标准均按照《城镇污水处理厂污染物排放标准》GB18918-2002中的一级B标准,但随着对环境保护的要求越来越高,一级B标准已无法满足我们对污水处理厂污水排放的要求。2007年太湖流域发生蓝藻暴发,引发了无锡供水危机的重大水污染事件[3],为此江苏省政府正式批准自2008年1月1日起,太湖流域实施城镇污水处理厂以及重点行业主要水污染物排放限值[4],越来越多的城市污水处理厂为响应国家节能减排号召,排放标准由原来的规定的《城镇污水处理厂污染物排放标准》GB18918-2002中的一级B标准提升为一级A或者更高标准,对城镇污水处理来说,应该严格依据《城镇污水处理厂污染物排放标准》中的相关规定实施分类治理。为贯彻国家的整体部署,截至2010年底,江苏省需对位于太湖流域的169座污水处理厂进行提标改造,总体规模约有364.82×104m3/d,预计总投资大概为27亿元[5]。
通过表1可以看出,一级标准A相对于一级标准B来说,对污水的处理程度更深,污水中污染物含量相对较小,对环境的污染较低。因此,世界各国在一级B的基础之上,为了可以达到一级标准A均对污水处理厂进行提标改造。