南通边检大楼工程施工组织设计

 2022-01-30 19:22:52

论文总字数:55279字

摘 要

本课题是南通边检行政楼的设计工程。该工程位于南通园林路与洪江路交叉口,项目为一幢办公楼,是市政工程。该建筑位于南通园林路与洪武路交叉口,为一幢15层简单装修办公楼,主体为框架结构,建筑面积17000平方米,建筑高度83.1m,地下室内外高差3.950米。一层层高为5m,二层和十五层层高4.2m,三至十四层层高3.7m,标准层层高为4.2m。裙楼2层,层高10.75米。地下共一层,层高3.9m。本工程结构设计使用年限为50 年,建筑结构安全等级为二级, 地基基础设计等级为甲级,地震设防烈度为6 度,设计地震分组为第二组,抗震设防类别为丙类,建筑场地类别三类,屋面防水等级为二级,地下室防水等级一级。

根据现有资料,主要包括设计院提供的建筑、结构图纸,以及设计研究院提供的地勘资料等,编写了施工组织设计报告。该报告内容包括:编制依据及原则,工程概况,主要施工部署,质量管理及保证措施,施工进度计划,主要施工技术,特殊时期施工以及专项方案等。本施工组织设计报告对于于施工具有指导性作用,根据本报告进行人工,器械及材料的合理安排,可以有效保证工期以及施工质量。

标准层模板采用18mm厚木胶合板做面板,50×70木方作背楞,选用Φ48×3.5m(无缝采用Φ48×3.0m)钢管支撑体系;支架每三层周转一次。

本工程1到3层采用落地式脚手架,脚手架步距为1.8m,立杆纵距为1.5m,立杆横距为1.05m,钢管型号采用Ф48×3.0m;3层以上采用悬挑式脚手架,每4层一挑。

关键词:施工组织设计;高支模;剪力墙;脚手架工程。

Abstract

This topic is the design project of Nantong border administration building. The project is located in Nantong Garden Road and the road intersection, the project is an office building, municipal engineering. The building is located in Nantong Garden Road and Hongwu Road intersection, a building 15 simple decoration of office buildings, the main frame structure, building area of 17000 square meters, building height 83.1m, underground height difference between indoor and outdoor 3.950 meters. A layer of high for 5m, two and fifteen layers of high 4.2m, three to fourteen layers of high 3.7m, standard layers of high to 4.2m. 2 storey podium, the height of 10.75 meters. Underground, a layer of high 3.9m. This engineering structure design service life is 50 years, structural safety grade is secondary, the foundation design level for Grade A, seismic fortification intensity is 6 degrees, the seismic design are grouped into the second group, the seismic fortification category C, building site categories three categories, roofing waterproofing rank for second level, the basement waterproof grade first level.

According to the existing information, including the Design Institute of architecture, structural drawings, as well as the design and Research Institute of geological prospecting data, the preparation of the construction organization design report. The report includes: preparation of the basis and principles, engineering survey, the main construction of the deployment, quality management and assurance measures, the construction schedule, the main construction technology, special period of construction and special programs, etc.. The construction organization design report for the construction of a guiding role, according to the report of the manpower, equipment and materials of the reasonable arrangement, can effectively guarantee the construction period and the quality of construction.

Standard template layer using 18mm thick plywood panel, 50 x 70 wood for Flute back, selection of phiФ48×3.5m (seamless use of phi Ф48×3.0m) steel pipe support system; every third floor bracket turnover time.

This project 1 to 3 layers of the floor type scaffolding, scaffolding step distance is 1.8m, pole vertical distance 1.5m, the pole horizontal distance is 1.05m, types of tubes with diameter of Ф48×3.0m; 3 layer above the cantilevered scaffolding, each layer 4 a challenge.

Key word:The construction organization design; formwork; shear wall; scaffold engineering.

目录

第1章 编制依据及原则 8

1.1 编制依据 8

1.2 编制原则 9

第2章 工程概况 10

2.1 工程概况 10

2.1.1建筑概况 10

2.1.2结构概况 10

2.1.3水文地质条件 11

2.2 工程目标 11

第3章 施工部署 12

3.1部署原则 12

3.2 施工段划分 12

3.2.1桩基施工阶段 12

3.2.2土方开挖及支护施工期 13

3.2.3地下室结构施工期 13

3.2.4主体结构、装饰安装施工期 13

3.2.5扫尾施工阶段施工段的划分及作业组织 13

3.3组织管理架构 13

3.4施工进度计划 13

3.4.1施工整体进度计划 13

3.4.2进度计划安排 14

第4章 施工技术方案 14

4.1 工程测量 14

4.2 钻孔灌注桩施工 14

4.2.1钻孔灌注桩工程概况 14

4.2.2 进度计划 14

4.2.3 施工工艺 15

4.3 土方开挖工程及维护 15

4.3.1土方开挖 15

4.3.2土方开挖质量的要求 17

4.3.3土方开挖安全的要求以及安全保证措施 17

4.4 钢筋混凝土工程 18

4.4.1 混凝土工程 18

4.4.2 钢筋工程 19

4.5砌体工程 21

4.5.1砌体材料 21

4.5.2砌体质量控制要点 21

4.5.3砌体砌筑一般规定 21

4.6 垂直运输以及外脚手架工程 22

4.6.1塔吊 22

4.6.2施工电梯 23

4.6.3外脚手架 23

第5章 高大支模专项方案 39

5.1工程概况 39

5.1.1建筑概况 39

5.1.2编制依据 39

5.2搭设楼层 40

5.3施工准备 40

5.3.1技术准备 40

5.3.2材料准备 40

5.4结构构件情况及模板支撑搭设参数 41

5.5施工部署 43

5.6支模架的构造的要求及措施 44

5.6.1立杆 45

5.6.2水平杆: 45

5.6.3剪刀撑: 45

5.7支模架的搭设及拆除 45

5.8支撑体系的检查以及验收 48

5.9 高大模架计算书 50

5.9.1 300800梁模板计算书 50

5.9.2 400900梁模板支架计算书 61

5.9.3 400×900梁侧模板计算书 71

5.9.4 120厚模板支架计算书 76

第6章 质量管理及保证措施 83