苏南A城市5万吨天污水处理厂设计

 2022-04-04 21:55:48

论文总字数:35631字

摘 要

本设计计算书对日处理量5万吨的苏南A城市污水处理厂工况进行了介绍,包括该污水厂的进出水水质、技术要求等。在对相关材料细致分析后,确定了该污水厂设计的重点难点,即进水的COD较高,以及TN去除的问题。经过对当前国内外污水厂几种常用的处理工艺细致比较,再结合污水厂的进水水质特点和出水水质要求,最终确定了该污水厂的污水处理工艺为一级处理的初沉池 水解酸化池,二级处理的工艺以及后续三级处理的混凝、沉淀、过滤和消毒工艺相结合,这种工艺的选择,不仅有优异的脱氮除磷效果,而且出水水质完全可以达到一级A的标准。污泥的处理采用重力浓缩与机械脱水相结合的处理处置方式,这种污泥处理方式不仅简单,且不会发生污泥的二次污染。本设计的计算过程参照相关的设计手册和国家标准规范,经过严谨细致的计算,最终确定了污水厂各个构筑物的尺寸、各种参数等,此外通过对计算结果数据得整理,绘制了污水厂平面、高程以及构筑物的CAD图纸,在设计计算的最后,本设计对该污水厂的建设成本和运行维护管理成本进行了估算,在经济的角度上论证了该设计的可行性。

关键词:污水处理厂,工艺,投资估算

Abstract

This design calculation book introduces the working conditions of the Sunan A city sewage treatment plant with a daily processing capacity of 50,000 tons, including the water quality and technical requirements of the sewage plant. After careful analysis of the relevant materials, the key difficulties in the design of the wastewater treatment plant were determined, namely, the high COD of the influent water and the problem of TN removal. After careful comparison of several common treatment processes at the domestic and international sewage plants, combined with the influent water quality characteristics and effluent water quality requirements of the wastewater treatment plant, the sewage treatment process of the sewage treatment plant was finally determined to be the primary treatment tank for primary treatment hydrolysis. The combination of acidification tank, secondary treatment process and subsequent three-stage treatment of coagulation, sedimentation, filtration and disinfection process, the selection of this process not only has excellent nitrogen and phosphorus removal effect, but also complete effluent quality. Can reach the level A standard. The treatment of sludge is a combination of gravity concentration and mechanical dewatering. This sludge treatment method is not only simple, but also does not cause secondary pollution of sludge. The calculation process of this design refers to the relevant design manual and national standard specification. After rigorous and meticulous calculation, the size and various parameters of each structure of the sewage treatment plant are finally determined. In addition, the sewage treatment plant plane is drawn by sorting out the calculation result data. At the end of the design calculation, the CAD drawings of the elevations and structures are used to estimate the construction cost and operation and maintenance management costs of the wastewater treatment plant. The feasibility of the design is demonstrated from an economic point of view.

Keywords: wastewater treatment plant, process, investment estimate.

目录

摘要 I

Abstract II

第一章 概述 3

1.1设计指导 3

1.1.1 设计目的 3

1.1.2 设计要求 3

1.1.3 设计内容 3

1.1.4 设计规范 3

1.2 原始条件及数据 4

第二章 工艺流程比选 4

2.1 工艺方案选择原则 4

2.2 工艺流程比较 5

2.2.1 传统活性污泥法(CAS) 5

2.2.2 A/A/O法 6

2.2.3 SBR法 6

2.2.4 OD法 7

2.3 工艺流程选择 7

2.3.1 主体工艺流程选择 7

2.3.2 一级处理工艺流程选择 8

2.3.3 三级处理工艺流程选择 9

2.3.4 污泥处理工艺流程选择 9

2.3.5 污水厂的总体工艺流程 9

2.3.6 池型选择 10

第三章 设计计算 12

3.1 原始数据处理 12

3.2事故池 12

3.3 格栅 13

3.3.1 粗格栅 13

3.3.2 细格栅 15

3.4 初次沉淀池——平流式初沉池 17

3.5 水解酸化池 20

3.6 生化池 21

3.6.1 设计水质 21

3.6.2 已知条件 22

3.6.3 设计计算 22

3.7 二次沉淀池——辐流式二次沉淀池 31

3.7.1 已知条件 31

3.7.2 设计计算 31

3.8 连续式重力浓缩池 34

3.8.1 已知条件 34

3.8.2 设计计算 34

3.9 药剂溶解池和溶液池 36

3.9.1 已知条件 36

3.9.2 设计计算 36

3.10 水平轴机械絮凝池 36

3.11 平流沉淀池(与絮凝池合建) 39

3.11.1 已知条件 39

3.11.2 设计计算 39

3.12 三级处理除磷污泥量的计算 41

3.13 深床滤池 42

3.13.1 已知条件 42

3.13.2 设计计算 42

3.14 消毒——紫外线消毒 46

3.14.1 已知条件 46

3.14.2 设计计算 47

3.15 贮泥池 48

第四章 水头损失与高程布置 50

4.1 构筑物水头损失 50

4.2 污水管线水头损失 50

4.3 高程布置 51

4.4 提升泵房 52

4.5 污泥高程布置 54

第五章 投资概算 56

5.1 构筑物配套设备 56

5.2 建、构筑物尺寸 57

5.3 污水厂建设投资 58

5.4 运行维护和管理费用 60

参考文献 62

致 谢 63

第一章 概述

1.1设计指导

剩余内容已隐藏,请支付后下载全文,论文总字数:35631字

您需要先支付 80元 才能查看全部内容!立即支付

该课题毕业论文、开题报告、外文翻译、程序设计、图纸设计等资料可联系客服协助查找;