淮安涟水城市广场2号楼施工组织设计

 2021-12-17 21:40:52

论文总字数:49980字

摘 要

2,其中2号楼建筑构成为: 1号、2号通体防空地下室,2号楼商业裙楼和2号楼高层住宅。结构层次是1层地下室,4层商场,28层住宅与顶层阁楼,住宅标准层高2.9m。结构形式为框剪结构。

本施工组织设计是针对涟水城市广场工程一期工程2号楼施工的纲领性文件。是为完成施工任务制定先进合理的施工工艺、创造必要的生产条件所做的规划设计,是指导2号楼施工工程进行施工准备和组织现场施工的技术经济文件,是现场施工的法规。根据国家对建设项目的要求,来确定经济合理的规划方案,对目标工程在时间和空间、人力与物力、技术跟经济、计划与组织等方面做出高效合理的安排,以保证施工任务得以按照预定目标,安全、优质、高速且低耗地完成。

本设计主要内容包括以下:工程概况;进度计划;施工场地平面布置;脚手架与高支模两个专项方案;季节性施工措施以及安全;管理等措施;另含中文摘要、参考文献、致谢。

关键词:钢筋混凝土结构;框剪结构;施工组织设计;扣件式钢管脚手架;高支模

The construction organization design of the No.2 Building in Lianshui town plaza

Abstract: Lianshui Town Plaza Phase of the project total construction area reached 52318m2, the No. 2 building form is: No. 1, No. 2 air defense basement and No. 2 high-rise residential buildings.Structure level is 4 layers shopping malls and 28 layers of residential buildings, residential standards high 2.9m.Structure form as frame shear structure.

The design of the construction organization is a programmatic document for the construction of phase 2 building of the city plaza in Lianshui.. Is for the completion of the construction task to create the necessary production conditions, develop the advanced and reasonable construction process planning design, is to guide the No.2 construction engineering construction preparation and organization of the construction site of the technical and economic documents and regulations is the construction site. According to the national requirements of project construction, to determine the economic and reasonable plan, proposed works in manpower and material resources, time and space, the technology and the economy, the plan and organization made a comprehensive and rational arrangement to ensure in accordance with the intended target, high quality, safe, high speed and low cost to complete construction tasks.

The main content of this design include: project overview; schedule; construction site layout; scaffolding and formwork two special programs; seasonal construction measures and safety; management measures; also contains abstract, references, thanks.

Key words: Reinforced concrete structure;frame shear structure;the construction organization design;steel tubular scaffold with fastenings;high–formwork support

目录

目录 1

第1章 编制说明 1

1.1 编制依据 1

1.2 现场条件 1

1.3 编制的范围 1

1.4 本工程采用的主要施工技术 1

第2章 施工现场平面布置 3

2.1施工平面布置说明 3

2.2施工总平面布置图 3

第3章 工程进度计划与工期进度保证措施 4

3.1施工总进度计划安排 4

3.2工程施工总进度计划横道图 4

3.3进度保证措施 5

3.3.1施工技术及质量控制上的保证 5

3.3.2 材料及施工设备上的保证 5

3.3.3人员质量与数量上的保证 5

3.3.4施工计划组织与管理上的保证 6

3.3.5协调配合措施上的保证 6

第4章 主要施工方法技术措施、施工设备及临时设施 7

4.1工程概况 7

4.1.1工程简况 7

4.1.2工程施工特点与对策 9

4.2主要施工部署 10

4.2.1 总体设想 10

4.2.3 总体施工安排 11

4.2.4 施工布局 11

4.2.5施工区工作段划分 11

4.2.6水电安装施工 11

4.2.7装饰工程施工 12

4.2.8工程管理 12

4.3施工现场准备工作 12

4.3.1围墙、场地、道路 12

4.3.2施工现场临时排水 12

4.3.3施工现场临时供水 12

4.3.4施工现场临时供电 14

4.3.5劳动力配备计划 15

4.3.6机械设备配备计划及进场时间要求 15

4.3.7垂直运输设备 17